PR- 2017-01 - Parks & Facilities, Fire Halls and Cemeteries Grass Cutting - Awarded to various contractors see attached.
PR-2017-02 - Accessibility Upgrades at The Point Washrooms - Awarded to Joe Bowes Carpentry in the amount of $94,606.00 plus HST.
PW-2017-01 - Surface Treatment - Awarded to Smiths Construction Company in the amount of $ 641,155.28 including applicable taxes.
PW-2017-02 - Micro Surfacing Program - Awarded to Miller Paving Ltd. in the amount of $368,527.13 (incl HST)
PW-2017-03 - One Half Ton Extended Cab 4 X 4 Pick up Truck - Awarded to Gananoque Chevrolet in the amount of $34,601.16 (including HST)
PW-2017-04 - One 2017 Model 3/4 Ton Truck with Plow Equipment - Awarded to Gananoque Chevrolet in the amount of $53,711.05 (including HST)
PW-2017-05 - Crack Sealing Program for 2017 - Awarded to Roadlast Asphalt and Sealing Maintenance in the amount of $70,060.00 (including HST)
PW-2017-06 - Dust Suppression Program for 2017-2019 - Awarded to Morris Chemicals Incorporated in the amount of $361,501.12 (including HST)
PW-2017-08 - Pavement Marking Program for Townships of Central, North and South Frontenac and Frontenac Islands - Awarded to Trillium Pavement Marking in the amount of $137,523.00 plus HST.
PW-2017-09 - Construction of a Municipal Fire Hall - Perth Road - Awarded to Anglin in the amount of $1,465,569.00,
FD-2017-01 - One 2017 or 2018 Model Three Quarter Ton 4 X 4 Pick Up Truck - Awarded to Gananoque Chev Olds in the amount of $34,088.00 (excluding HST)
PW-2017-10 - Arterial and Local Roadside Mowing Program - Awarded to Percy Snider in the amount of $39.00 per cut for Local Mowing and $68.00 per cut for Arterial Mowing for 2017.
PW-P01-2017 - Engineering Services for the Rehabilitation of Sunbury Road - Awarded to G.D. Jewell Engineering in the amount of $45,567.30. (excluding HST)
PW-2017-13 - 2017 Pavement Rehabilitation Program - Awarded to Kiley Paving Ltd in the amount of $282,625.09 including HST.
PW-2017-21 - Wood Chipper - Awarded to Nortrax Canada Inc in the amount of $71,753.87 including taxes.
PW-2017-22 - Harrowsmith Intersection and Roadworks (Road 38 and Wilton Rd) - Awarded to Morven Construction in the amount of $1,542,402.54 including all applicable taxes.
PW-2017-23 - 2017 Gravel Supply Program - Awarded to Cruickshank Construction for Buck Bay Road in the amount of $59,040.24 for Granular A and Bradshaw Road in the amount of $ 98,963.70 for Granular A and Sweets Sand and Gravel for Randy Clarke Road in the amount of $77,034.36 for Granular A. Pricing includes HST.
PW-RFQ1-2017 - Contracted Equipment, Materials and Trades - Various prices and contractors, click here for results.
PR-2017-03 - Roadside Weed Spraying - Awarded to Wagar & Corput Weed Control in the amount of $4,750.00 excluding HST (total based on 2500 square metres).
PR-RFQ1-2017 - Supply and Installation of Garage Doors for Hartington Patrol Yard and Keeley Patrol Yard - Awarded to Draper Doors in the amount of $2900.00 for 8 - 14" 2" X 14' doors, $320.00 for 1 - 16' 2" X 16' and $3075.00 for 1 - 16' 2" X 14' excluding HST.
PW-P02-2017 - Engineering Services for the Design of Two Major Intersections - Awarded to G.D. Jewell Engineering in the amount of $31,066.50.
PW-P03-2017 - Consulting Engineering Services of Bridge and Culvert Replacement - Awarded to HP Engineering in the amount of $4,420.00 for Sydenham Bridge, $12,313.00 for Bunker Hill Bridge and $12,313.00 for Buck Bay Bridge (prices excluding taxes).
RFP #FD- 2017-02 ONE FIRE APPARATUS MINI PUMPER - Awarded to Fort Garry in the amount of $286,810.05 including taxes.
PR-2017-25 for 2017-2019 SNOW REMOVAL for PARKS & FACILITIES, CEMETERIES & FIRE HALLS - awarded to various contractors see breakdown here.
RFP #2017-C02 for LEGAL SERVICES - Awarded to Cunningham Swan.(fixed hourly rates depending on practice group)
PW-2017-02 for DIESEL OUTDOOR BACK UP GENERATOR - Awarded to Goris Electric Ltd in the amount of $48,000.00 excluding HST.
PW-2017-07 for SUPPLY & INSTALLATION of a POWER GATE AT KEELEY ROAD PATROL YARD - awarded to Wemp & Smith Construction Ltd in the amount of $23,690.00 excluding HST.
Contact Us